Product Description
PIN, LINK
Specifications
Product Overview
| Product Type | Pin and Link Assembly |
Physical Specifications
| Material | Hardened Steel |
| Durability | Designed for repeated load cycles and mechanical stress |
Compatibility
| Application | Lift chains, linkages, mechanical assemblies |
| Equipment Type | Electric pallet jacks, forklifts, scissor lifts |
Frequently Asked Questions
Q: What is SKU 800127258 and what does it do?
A: SKU 800127258 is a pin and link assembly used in material handling equipment. These components connect lift chains, linkages, and mechanical assemblies on electric pallet jacks, forklifts, and scissor lifts. They are critical fastening components that must be properly sized and secured.
Q: What equipment types use this pin and link assembly?
A: This pin and link assembly fits electric pallet jacks, electric forklifts, electric pallet movers, and scissor lift applications. Verify your equipment make and model compatibility before ordering, as pin and link specifications vary across brands like Crown, Toyota, Raymond, and Yale.
Q: How long does a pin and link assembly typically last?
A: Lifespan depends on equipment usage intensity and maintenance practices. Pins and links show wear through play or movement in lift chains and linkages. Regular inspection for looseness, corrosion, or bending helps extend service life and prevents unexpected equipment failure.
Q: What material is this pin and link assembly made from?
A: Pin and link assemblies for electric lift trucks are typically made from hardened steel to withstand repeated load cycles and mechanical stress. This material resists deformation and provides reliable performance in demanding material handling environments.
Q: What maintenance do pin and link assemblies require?
A: Inspect pins and links regularly for looseness, rust, or visible damage. Keep components clean and free from debris. Ensure fastening hardware remains tight. Do not attempt to weld or modify pins, as this compromises structural integrity. Replace damaged components promptly to prevent chain or linkage failure.
